A Case Study: The
Impact of a Registered Energy Manager at a Malaysian Factory
Reading Time: Approximately 7-8 minutes
Key Takeaway: Are you a factory owner or operations manager
in Malaysia facing consistently high energy bills, perhaps even feeling the
pressure of the new Energy Efficiency and Conservation Act (EECA) 2024? You
might be wondering if you truly need a dedicated energy expert, or if your
existing team can handle energy saving on their own. Many industrial facilities
overlook the profound impact a specialized professional can have, leading to
missed opportunities for significant cost reduction and regulatory compliance.
This article presents A Case Study: The Impact of a Registered Energy Manager
at a Malaysian Factory, illustrating how the expertise and systematic approach
of a Registered Energy Manager (REM) transformed a typical manufacturing plant,
leading to substantial savings, improved efficiency, and a clear path to
meeting national energy objectives.
Problem: Malaysian factories are significant energy
consumers, facing escalating utility costs and, for many, new mandatory
requirements under the Energy Efficiency and Conservation Act (EECA) 2024 to
appoint a Registered Energy Manager (REM) and implement an Energy Management
System (EnMS). Despite these pressures, many factory owners and operators are
either unaware of the full benefits an REM can bring or are hesitant to invest
in such a role, often viewing it as an additional cost rather than a strategic
asset. This reluctance results in continued energy wastage, missed
opportunities for operational optimization, and a struggle to comply with
emerging regulations, ultimately hindering competitiveness and sustainability.
Agitate: Without a dedicated and qualified Registered
Energy Manager, factories often lack the systematic approach needed to identify
deep-seated energy inefficiencies. This means ongoing financial leaks through
excessive electricity and fuel consumption, a reactive rather than proactive
approach to maintenance, and an inability to accurately report energy
performance as increasingly demanded by customers and regulators. Failure to
comply with EECA 2024 due to the absence of a properly appointed REM and an effective
EnMS could lead to penalties, reputational damage, and a lost competitive edge
in a market rapidly prioritizing sustainability.
Solve: This article provides A Case Study: The Impact of a
Registered Energy Manager at a Malaysian Factory, demonstrating the tangible
value and return on investment a Registered Energy Manager (REM) delivers. We
will walk through how a REM at a specific Malaysian manufacturing plant
systematically implemented an Energy Management System, identified and executed
key energy-saving initiatives, and established robust monitoring and reporting,
resulting in significant cost reductions and improved operational efficiency.
This case study underscores how a REM is not just a compliance necessity under
EECA 2024, but a strategic enabler for sustained energy performance and
long-term business resilience.
Summary
Is your factory using too much energy? You might think
saving energy is just about changing light bulbs, but it's much more. This
article shares A Case Study: The Impact of a Registered Energy Manager at a
Malaysian Factory.
- What
is a Registered Energy Manager (REM)? They are experts,
certified by the Energy Commission in Malaysia, whose main job is to help
big energy users (like factories) manage their energy better.
- Why
are REMs important now? Because of the new Energy
Efficiency and Conservation Act (EECA) 2024 in Malaysia! If your
factory uses a lot of energy (over 21,600 Gigajoules/year), you must
have an REM and an Energy Management System (EnMS).
- The
Problem: Many factories waste energy because
nobody is truly in charge of finding and fixing those issues.
- The
Solution: A good REM can lead the way to big
savings.
- What
this Case Study shows:
- How
an REM helped a Malaysian factory reduce its energy use.
- The
specific steps they took (like finding hidden waste, fixing machines,
setting up tracking).
- The
amazing results (how much money was saved!).
- Key
Takeaway: An REM is not just a
"must-have" for new laws; they are a smart investment that saves
your factory real money and makes it more efficient.
1. The Challenge: A Factory's Growing
Energy Bill
Let's look at a real-world example to understand A Case
Study: The Impact of a Registered Energy Manager at a Malaysian Factory.
Imagine a medium-sized manufacturing plant in Selangor, Malaysia. This factory
produces plastic components for various industries. Like many factories, its
energy bills, especially for electricity, had been steadily climbing.
Here were some of the problems the factory was facing:
- High
and Rising Energy Costs: Their monthly
electricity bill was consistently over RM150,000, and it kept increasing
due to growing production and higher electricity tariffs.
- Hidden
Waste: The factory knew they used a lot of
electricity for their machines, compressed air systems, and cooling, but
they didn't really know where the biggest waste was happening.
- No
Dedicated Focus: While engineers and maintenance staff
were busy keeping machines running, no one was truly dedicated to looking
for energy-saving opportunities or tracking overall energy performance.
- Old
Habits: Machines were sometimes left running
unnecessarily; lights were on even in empty areas. These small things
added up.
- New
Regulations Looming: The factory's management was aware
of the upcoming Energy Efficiency and Conservation Act (EECA) 2024
(which officially came into effect on January 1, 2025). This new law means
that factories like theirs, which consume a lot of energy, must
appoint a Registered Energy Manager (REM) and set up an Energy
Management System (EnMS). They knew they needed to comply, but weren't
sure how.
The management team realized they needed a systematic way
to tackle their energy problem. They understood that simply telling staff to
"save energy" wasn't enough. They needed an expert.
2. The Solution: Appointing a
Registered Energy Manager (REM)
After looking at their options, the factory decided to
appoint a Registered Energy Manager (REM), as required by the Energy
Commission under EECA 2024. They hired an experienced REM who had a
strong background in industrial energy management and was certified by the
Energy Commission.
What exactly does a Registered Energy Manager
do?
In Malaysia, a Registered Energy Manager (REM) is a
professional officially certified by the Energy Commission (Suruhanjaya
Tenaga). Their main duties, especially under the new EECA 2024, include:
- Setting
up an Energy Management System (EnMS): This is a
structured way for a company to manage its energy use. It's like having a
system for quality (like ISO 9001) but specifically for energy (like ISO
50001). The REM leads the creation of energy policies, objectives, and
action plans.
- Collecting
and Analyzing Energy Data: They monitor electricity
bills, fuel consumption, and other energy data to understand how and where
energy is being used. This often involves installing sub-meters.
- Identifying
Energy-Saving Opportunities: They conduct detailed
energy audits (sometimes with the help of a Registered Energy Auditor
(REA)) to find specific areas where energy is being wasted or can be
used more efficiently. This could be anything from leaky compressed air
lines to inefficient motors.
- Proposing
and Implementing Energy Saving Measures: They recommend
solutions and oversee the implementation of projects to save energy.
- Monitoring
and Verifying Savings: They track the energy savings
achieved by the projects to make sure they are real and consistent.
- Reporting
to Management and Authorities: They prepare regular
reports on the factory's energy performance for the company's top
management and also submit required reports to the Energy Commission (as
per EECA 2024 requirements).
- Promoting
Energy Awareness: They educate employees and build a
culture of energy efficiency within the organization.
- Ensuring
Compliance: They make sure the factory follows all
relevant energy efficiency laws and regulations.
The REM at our case study factory started by building an
energy management team with representatives from different departments
(production, maintenance, finance). This team would work together to gather
data and implement changes.
3. The REM's Actions: A Systematic
Approach to Savings
The Registered Energy Manager at the Malaysian
factory didn't just walk in and instantly cut costs. They used a systematic
approach, guided by their expertise and the principles of an Energy Management
System (EnMS). Here are the key steps they took:
Action 1: Setting Up the Energy Management
System (EnMS)
- Energy
Policy: The REM helped the factory's top
management create an official Energy Policy, stating their commitment to
reducing energy consumption. This showed everyone in the factory that
energy saving was a serious goal.
- Energy
Team: They formalized the energy management team, assigning
clear roles and responsibilities to members from different departments.
This ensured that energy management wasn't just one person's job, but a
shared responsibility.
- Baselines
and Targets: The REM established a baseline of the
factory's energy consumption (e.g., average kWh per month for the past
year). Then, they set clear, measurable targets for reduction, for
example, "reduce overall electricity consumption by 10% within 12
months."
- Data
Collection System: They put in place a system to
collect energy data daily and monthly, not just from the main electricity
meter, but also from sub-meters installed on major equipment (like air
compressors, chiller units, and large production lines). This helped them
see exactly where energy was going.
Action 2: Identifying Key Energy-Saving
Opportunities (Energy Audits)
With the data system in place, the REM, sometimes working
with a Registered Energy Auditor (REA), identified the biggest areas of
energy waste. This is where their expertise really shone. They conducted
detailed energy audits focusing on:
- Compressed
Air System (the silent energy killer!):
- Problem:
The factory had several large air compressors running constantly, with
many visible and invisible air leaks in the piping system. This meant the
compressors had to work much harder and longer than needed. Also, older
compressors were not very efficient.
- REM's
Solution:
- Used
a leak detection device to find all leaks (some were tiny but added
up!).
- Organized
a team to repair all identified leaks.
- Implemented
a schedule for turning off compressors during non-production hours.
- Recommended
replacing the oldest, most inefficient compressor with a new, variable
speed drive (VSD) compressor that only runs as much as needed.
- Optimized
the pressure settings – often factories run their compressed air at a
higher pressure than actually required, wasting energy.
- Air
Conditioning & Ventilation (ACMV):
- Problem:
The factory's administrative offices and some sensitive production areas
had older air conditioning units. Thermostats were often set too low
(e.g., 20-22°C), and units ran after office hours. Ventilation fans were
also running continuously.
- REM's
Solution:
- Adjusted
thermostat settings to a more energy-efficient 24-25°C in
offices.
- Installed
programmable timers for AC units in offices to switch off automatically
after working hours.
- Implemented
a regular cleaning and maintenance schedule for all AC filters and
coils.
- Identified
areas where natural ventilation could be improved to reduce reliance on
mechanical fans.
- Lighting
Systems:
- Problem:
Many areas in the factory were still using old fluorescent tubes and
high-bay metal halide lamps, which consumed a lot of electricity and
required frequent replacement.
- REM's
Solution:
- Developed
a phased plan to replace all existing lighting with high-efficiency
LED lights. LEDs use much less energy and last significantly longer.
- Installed
motion sensors in low-traffic areas like storerooms and restrooms, so
lights would only be on when needed.
- Encouraged
staff to use natural daylight where possible by keeping windows and
skylights clean.
- Production
Machinery Optimization:
- Problem:
Some older machines had motors that ran at full speed regardless of the
load, or they were left on during short breaks between production runs.
- REM's
Solution:
- Identified
motors that could benefit from Variable Speed Drives (VSDs),
which adjust motor speed to match the load, saving energy.
- Worked
with production supervisors to implement better shutdown procedures for
machines during breaks or idle times.
- Introduced
a system to track specific energy consumption per unit of product,
helping identify inefficient production batches.
- Awareness
and Training:
- Problem:
Employees weren't fully aware of how their actions impacted energy
consumption.
- REM's
Solution:
- Conducted
regular training sessions for all staff on energy-saving best practices
(e.g., turning off lights, reporting leaks, proper machine operation).
- Put
up signs and posters reminding employees about energy conservation.
- Celebrated
energy-saving successes to motivate the team.
Action 3: Monitoring, Verification, and
Reporting
The REM understood that identifying savings wasn't enough;
they had to prove and sustain them.
- Continuous
Monitoring: The factory's sub-metering system,
overseen by the REM, continuously collected data.
- Monthly
Performance Reviews: The REM prepared monthly reports
showing the actual energy consumption against the established baseline and
the calculated savings. These reports were shared with the management
team.
- Troubleshooting:
If actual savings weren't meeting expectations, the REM would investigate,
find the root cause, and implement corrective actions.
- Compliance
Reports: The REM prepared and submitted the
necessary Energy Efficiency and Conservation Reports to the Energy
Commission, as required by EECA 2024. This ensured the factory was
compliant and avoided potential penalties.
4. The Impact: Measurable Savings and
Beyond
The impact of the Registered Energy Manager at this
Malaysian factory was significant and quickly became evident:
- Significant
Cost Savings: Within the first year, the factory saw an
average 18% reduction in its overall electricity consumption. This
translated to an average monthly saving of RM27,000 on their
electricity bill! Over a year, that's over RM320,000.
- Improved
Operational Efficiency:
- The
compressed air system became much more reliable with fewer leaks,
reducing maintenance costs.
- The
new LED lighting provided better illumination in production areas,
improving safety and worker comfort.
- Optimized
machine operation reduced wear and tear, potentially extending equipment
lifespan.
- Compliance
with EECA 2024: The factory was fully compliant with the
new energy management requirements under EECA 2024, demonstrating its
commitment to national energy efficiency goals. This prevented potential
fines and enhanced their reputation.
- Enhanced
Reputation and ESG: The factory could now credibly
showcase its commitment to sustainability, which improved its image with
customers, investors, and the local community. This is crucial for ESG
(Environmental, Social, and Governance) reporting, which is becoming
increasingly important for businesses of all sizes.
- Increased
Employee Awareness: Employees became more
energy-conscious, leading to a cultural shift towards sustainability
within the factory. They understood that their actions contributed to the
company's success and environmental goals.
- Future-Proofing:
The established EnMS provided a solid foundation for continuous energy
improvement, allowing the factory to adapt to future energy challenges and
regulations.
This case study clearly demonstrates The Impact of a
Registered Energy Manager at a Malaysian Factory. The initial investment in
hiring an REM and implementing their recommendations quickly paid for itself
through significant energy cost reductions and provided numerous additional
benefits, far beyond just complying with a new law.
In summary, A Case Study: The Impact of a
Registered Energy Manager at a Malaysian Factory vividly illustrates that a
Registered Energy Manager (REM) is an indispensable asset, not merely a
compliance burden, for industrial facilities in Malaysia. As shown by the
significant energy cost reductions and operational improvements achieved in our
case study factory, an REM provides the specialized expertise and systematic
approach required to identify hidden energy waste, implement effective
solutions, establish robust monitoring, and ensure ongoing efficiency. Their
role is critical for navigating the complexities of energy consumption, meeting
the mandatory requirements of the Energy Efficiency and Conservation Act (EECA)
2024, and ultimately enhancing your factory's profitability, competitiveness,
and environmental sustainability. Don't view an REM as an expense, but as a
strategic investment that delivers tangible, measurable returns.
Is your Malaysian factory struggling with high
energy bills or navigating the new EECA 2024 requirements? If you're ready to
unlock significant savings, improve efficiency, and ensure compliance with the
latest energy regulations, our team of certified Registered Energy Managers
(REM) and Registered Energy Auditors (REA) can help. We provide expert energy
management services, conduct comprehensive energy audits, and guide your
factory through the establishment of an effective Energy Management System that
delivers real, lasting impact. Stop wasting money on energy and start investing
in your factory's sustainable future. WhatsApp or call us today at 0133006284
for a strategic consultation.