A Guide to the Different Phases of an EPC Project
Reading time: ~12 minutes
Key takeaway: Understanding each phase of an EPC project helps building owners and managers make informed decisions, avoid delays, and ensure project success.
A Guide to the Different Phases of an EPC Project
Introduction
Energy Performance Contracting (EPC) projects can feel overwhelming. Many building owners struggle to understand the sequence of work, responsibilities, and technical steps. When phases are skipped or misunderstood, projects face delays, cost overruns, or underperformance. This is the problem most owners face.
The solution is knowing A Guide to the Different Phases of an EPC Project. By understanding each phase—from initial assessment to long-term monitoring—you can anticipate challenges, plan resources, and ensure results meet expectations. This guide breaks down the entire process in clear, simple language to help you stay informed and in control.
Summary Box
What this article covers:
Overview of EPC project phases
Key activities in each phase
Roles and responsibilities
Tips to manage risks
Common pitfalls and solutions
Who this is for:
Building owners and managers
Facility and project managers
Public and private sector teams
Understanding EPC Project Phases (Simple Guide)
To grasp A Guide to the Different Phases of an EPC Project, it’s important to understand that an EPC project involves planning, designing, installing, and maintaining energy-saving solutions. Each phase builds on the previous one. Skipping steps or misunderstanding responsibilities can cause problems.
At an eighth-grade reading level, think of it like constructing a building: you wouldn’t start painting walls before laying the foundation. EPC projects follow a similar step-by-step process to ensure performance, savings, and safety.
Main phases typically include:
Preliminary Assessment and Feasibility Study
Detailed Energy Audit
Design and Engineering
Procurement and Contracting
Installation and Commissioning
Measurement and Verification (M&V)
Operation and Maintenance
1. Preliminary Assessment and Feasibility Study
The first step is understanding the project’s potential.
Key activities:
Collect basic building and energy data
Identify potential energy-saving measures
Estimate preliminary costs and savings
Why it matters:
A strong feasibility study ensures the project is viable before committing significant resources.
2. Detailed Energy Audit
A thorough audit pinpoints exactly where energy is used and wasted.
ITA role:
Walk through the facility
Take measurements and collect data
Analyze systems and identify opportunities
Red flags:
Relying only on benchmarks or assumptions
Skipping real measurements
3. Design and Engineering
This phase develops detailed plans for systems and equipment.
Key points:
Select appropriate technologies
Prepare drawings and specifications
Plan integration with existing systems
Why it matters:
Design determines whether the project will deliver promised energy savings.
4. Procurement and Contracting
Choosing equipment and contracting services comes next.
Important activities:
Evaluate bids and supplier options
Ensure quality and compatibility of equipment
Finalize contracts with clear roles and responsibilities
Tip:
Document everything carefully to avoid misunderstandings later.
5. Installation and Commissioning
Systems are physically installed and tested.
Key steps:
Supervise installation closely
Conduct functional tests and commissioning
Record results and hand over documentation
Red flags:
Poor supervision or skipped testing
Missing manuals or incomplete documentation
6. Measurement and Verification (M&V)
After installation, energy savings need to be tracked.
Activities include:
Set up monitoring systems and meters
Compare actual savings against baseline
Adjust systems if needed
Why it matters:
M&V confirms that your investment is delivering promised benefits.
7. Operation and Maintenance
Long-term success depends on proper upkeep.
Key tasks:
Follow preventive maintenance schedules
Train building staff on system use
Respond quickly to faults and alerts
ITA contribution:
They often support or audit operations to ensure ongoing performance.
Tips for Managing Risks Across All Phases
Involve an ITA early to review designs and plans
Keep detailed documentation of all phases
Communicate regularly with the project team
Watch for deviations from schedules or budgets
Verify all systems before final handover
Common Pitfalls to Avoid
Skipping detailed audits or measurements
Choosing equipment based on price alone
Assigning inexperienced staff to critical tasks
Ignoring maintenance and monitoring plans
Final Thoughts and Call to Action
Knowing A Guide to the Different Phases of an EPC Project ensures projects run smoothly, deliver real energy savings, and avoid costly mistakes. Following the steps outlined—from assessment to operation—helps building owners and managers make informed, confident decisions.